High Street Shop Condominiums (HSSC) introduces the new mechanics of business and commerce. Experience independent exclusive entry and exit points that allow you direct access to your specific shopping destination. Just park your vehicle and walk in to the outlet of your choice. Beyond residences and offices, Wave City Center creates innovative real estate assets. Our G + 2 storey developments have condominiums which possess all the vibrancy of high street shopping without the drawbacks. For shoppers, our multi-dimensional condominiums are more satisfying than conventional malls. These are not shopping hubs, but highly experiential areas where consumers are immersed in different activities. Each meticulously considered detail intensifies the shopping experience with pedestrian friendly pathways, convenient underground parking, glittering frontages, open landscaped areas and cozy sidewalk cafes. Customers will keep coming back for more. Retailers are offered extra room to breathe and expand with multi-purpose ground levels suitable for service, repair, stores, offers and, of course, more retail space.

Features
  • Over 8.5 lacs sq. ft. of High Street Shop Condominiums development
  • Areas Starting from 2206.24 sq.ft. to 4161.71 sq.ft(204.96 sq.m. to 386.63 sq.m.)
  • Well planned design, with double side entry for most of the units
  • No vehicular traffic inside the block
  • Built-up ground + 2 storey development
  • Each unit will have individual lifts and a staircase
  • Complete glass facade for good visibility
  • Uniform and pre-demarcated signage spaces
  • Landscaped open areas and well planned pedestrian pathways
  • 100% power back up, individual HVAC with BTU meters & wet points
  • Ample Parking Space for owners and visitors
  • Dedicated lifts and escalators from car parking to ground level
  • Well planned design, with 2 entry points for most of the units from main 45 m road
Specifications
Condominium Interiors

HVAC Centralized HVAZ system with FC and BTU meters
Floor Concrete floor (-) 50mm from the corridor floor level
Walls Rough plastered walls
Ceiling Exposed roof slab
Fire Fighting System Sprinkler and Firefighting system as per Fire by-law above false-ceiling level. Below the false-ceiling level the fire detection system/sprinklers shall be done by the buyer
Fire Detection System Intelligent Fire Detection system as specified by Fire by-law
Electricity Mains and standby with dual supply metering with prepaid meter system
Electric Installation Each Condominium will be provided with 3 phase power supply with a 4 Pole MCB, housed in a panel box. A fiber terminal box shall be provided to cater to extra ELV system. The remaining electric reticulation will be done by the buyer
Additional Specifications Each Condominium bay will be provided with an individual staircase and lift to connect the ground floor, first floor and second floor
Signage Specified location of uniform signage shall be specified by the developer
Condominium Front Stone finished with glazing (Aluminum powder coated separator)

Register to receive exclusive details!

I accept Term's & Conditions icon

Floor Plan

hssc floorplan

Register to receive exclusive details!

I accept Term's & Conditions icon

Video

 

Construction Update

  • BLOCK 3D HSSC (2) - Block walls for Block 4 & 6 completed and plaster work in progress.
  • BLOCK 3D HSSC (1)- Block works for walls and plaster for Block 1,2,3 & 5 completed. Façade work (Glazing Work and External painting) for Block 1 & 2 under progress. Sub- Grade of Road work, Internal corridor and Infra work under progress.
  • BLOCK 3D HSSC (2) - Block walls for Block 4 & 6 completed and plaster work in progress.
  • BLOCK 3D HSSC (1)- Block works for walls and plaster for Block 1,2,3 & 5 completed. Façade work for Block 1 & 2 under progress. Sub- Grade of Road work and Infra work under progress.
  • BLOCK 3D HSSC (2) - Block 4 & 6- Terrace Slab/Mumty slab completed. Block walls for Block 4 & 6 completed and plaster work in progress.
  • D HSSC (1)- Block works for walls and plaster for Block 1,2,3 & 5 completed. Façade work for Block 1 & 2 under progress. Sub- Grade of Road work and Infra work under progress.